Friday, December 10, 2010

Some trim is in














A before and after, of sorts, from the pantry. There was a spacer placed between the two original woods -the inside window frame and the trim. The trim was removed for new drywall and that went all the way to the inner frame. In some places the trim is not flush to the drywall. Hopefully some filler can be added there as well in order to cut down on the draft.
The other pic is of the east window along its north edge. Here the inner frame has been freed of its several layers of paint. It's most notable and recent was poo-brown. The final bits of varnish remain for spring clean-up.

It will be noted the the kitchen will not get the base boards that the rest of the house have. The three-piece needed to be custom made from fir. 34 linear feet of the three piece set would have run $750! Let's see if the $80 stained pine version will do enough...

No comments:

Post a Comment